- June 13, 2026
economic corridor
Maharashtra Opens Mumbai Pune Missing Link Route
- By admin
- . April 30, 2026
A new bypass section on the Mumbai–Pune Expressway is set to open to traffic, promising faster and safer travel between
Bengaluru Chennai Travel Time Reduced To Six Hours
- By admin
- . April 25, 2026
Travel between Bengaluru and Chennai could soon become significantly faster, with infrastructure upgrades along the intercity corridor expected to reduce
₹21,550 crore boost for Maharashtra–MP connectivity and mobility
- By admin
- . June 27, 2025
Indian Railways has sanctioned two major rail infrastructure projects totalling ₹21,550 crore, aimed at boosting connectivity between Maharashtra and