Government of Assam tenders construction of ROB at Kakati Gaon on Raha Kampur Road

Construction site of Railway Over Bridge (ROB) at Kakati Gaon Assam showing road and rail infrastructure works.

Construction of ROB at Kakati Gaon Assam tender by Government of Assam

The Government of Assam has issued a tender for the construction of a Railway Over Bridge at Kakati Gaon, RAHA.

The Public Works Roads Department of the Government of Assam has issued a tender for the construction of a Railway Over Bridge (ROB) at Kakati Gaon. This project involves replacing the existing Railway Level Crossing (LC) Gate No. ST-34 located at Railway Kilometer 104/7-8 on Raha Kampur Road. The tender is designated as a balance work under the ongoing construction of ROBs being executed on a 50:50 cost sharing basis. The contract type specified is Item Rate, and the execution period allowed for the completion of the work is 730 calendar days (approximately two years). This infrastructure development aims to improve road safety and traffic flow by eliminating the railway crossing point. The tender was published on October 12, 2026, with submission closing on November 6, 2026, and the bid opening scheduled for November 7, 2026. A pre-bid meeting is set for October 15, 2026. The estimated contract value is approximately ₹35.698 crore, with an earnest money deposit (EMD) of ₹71.39 lakh and a tender fee of ₹30,000. This tender represents a significant civil engineering project under the Government of Assam's initiative to enhance transport infrastructure and connectivity in the Raha area.

Tender ID 2026_PWD_54408_1
Tender Reference ROB/ST-34/ASSAM/RAHA/BALANCE WORK
Issuing Authority Government of Assam
Authority Type State
Project Category Civil Works – Roads
Location RAHA, Assam
Estimated Value ₹35.698 Crore
Citizen Benefit Not stated
Contract Type Item Rate
Submission Deadline 2026-11-06
Pre-Bid Meeting 2026-10-15
Document Fee 30,000
EMD 71,39,600
Issued Under Scheme Standalone
Tender Portal Link Not stated

The construction of the Railway Over Bridge (ROB) at Kakati Gaon is a crucial infrastructure improvement for the residents and commuters of Raha. By replacing the existing Railway Level Crossing Gate No. ST-34, the project will eliminate delays and safety hazards associated with the train-road intersection. This will reduce the risk of accidents between rail traffic and highway vehicles, thereby improving safety for all road users. Additionally, the new ROB will ease traffic congestion on Raha Kampur Road, facilitating smoother and more reliable journey times for daily commuters, commercial transporters, and emergency services. The project’s implementation under the Government of Assam’s public works department signifies a strategic investment in regional connectivity and road infrastructure. Citizens can expect enhanced travel efficiency and long-term benefits to economic activities due to improved transport links supported by this construction work.

For informational purposes only. Urban Acres Tender Watch is a neutral government tender information service. Verify all details on the official tender portal.

Recent tabs widget still need to be configured! Add tabs, add a title, and select type for each tab in widgets area.